Hook Hanger Multilateral System Saves Customer $360,000
Location Alaska
Problem
Lower multilateral well costs by reducing trips to run completion equipment.
Increase production from a mature field
Reduce operating risk.
Solution Baker Oil Tools HOOK Hanger™ Multilateral system.
Results
Simple installation reduced number of trips by 50% compared to a competitive system.
Rig time saved: 108 hrs
Cost savings: $360,000
Production increased 1075 BOPD, 280% over conventional single well.