To ensure delivery of this newsletter to your inbox, please add whatsnew@bakerhughes.com to your e-mail address book.
If you are having trouble viewing this page or are not able to access the links, click here.

 In this update...
 

Subscribe...
If you think your friends and colleagues might benefit from this information, please send this newsletter to them.
Subscribe Here!

Archive...
View past issues of the Baker Hughes Technology Update eNewsletter.

BakerHughesDirect...
Visit BakerHughesDirect for online customer solutions through Baker Hughes products, services, information and expertise. Register or Login

Dear {FirstName} {LastName}: Volume 5, Number 11

Welcome to Technology Update, the Baker Hughes eNewsletter to inform you about our latest technologies for oil and gas drilling, formation evaluation, completion and production.

OASISOASIS™ Process and Application Engineering Service Optimize Drilling Services for Gulf of Mexico Deep Gas Well
Baker Hughes OASIS™ process and the Application Engineering Service were recently applied successfully on a Gulf of Mexico deep gas well. An S-shaped directional profile was drilled through severe abnormal pressures to a target zone below 12,000 ft (3658 m) TVD. The Application Engineering team integrated the services of INTEQ directional drilling, drilling motors, AutoTrak™ system, Triple Combo MWD/LWD, Pressure Management Services, and Surface Logging Systems with a Baker Hughes Drilling Fluids oil-base mud system and Hughes Christensen drill bits—Tricone™, ZX™ PDC, and motor steerable PDC. The entire well was drilled with zero downhole tool failures and no hole cleaning issues. Casing runs went smoothly with strings set at required depth.


LithoTrak® Real-Time Density ImagingINTEQ Performs Geosteering with LithoTrak™ Real-Time Density Imaging for Offshore Saudi Arabia Well
INTEQ recently delivered real-time wellbore imaging services for an offshore Saudi Arabia well. Uncertainty about the geological structure required that LithoTrak 16-sector density images be transmitted real time to accurately navigate a 3555-ft (1084-m) 8-1/2" reservoir section. The image was transmitted directly to the client geosteering hub via RigLink(SM) satellite data transfer service to accurately geosteer the well. Additionally, 16-sector real-time density images were transmitted with almost 100% decoding throughout the run. Through proper pre-job planning and execution, all requirements were met to enable collaboration between key decision makers while the well was being drilled. The images were processed real-time to determine the azimuthal density of the geological structure as drilling progressed. The structural information enabled the customer’s geoscientists to make informed decisions about wellbore placement in real time.

GTX large-diameter Tricone bitHughes Christensen GTX Tricone™ Bit Sets Saudi Arabia Field Record
A Hughes Christensen 28" GTX large-diameter Tricone bit set a Saudi Arabia field record. The o-ring sealed bit drilled the longest section in the field of 2125 ft (648 m) with the fastest ROP of 37.6 ft/hr. This was 41% more footage and 31% faster than the closest competitor offset. The team met the operator’s objective to drill vertically through the Khafji formation from casing to casing with the fastest ROP to TD. Comparing the averages of two GTX bit runs in this field to the competitor’s top two average offsets, the HCC ROP was 21% faster.

RHEO-LOGIC constant rheology synthetic-based fluid systemBaker Hughes Drilling Fluids RHEO-LOGIC Fluid Minimizes Fluid Losses for Deepwater Gulf of Mexico Well
Baker Hughes Drilling Fluids has recently finished drilling the deepest, hottest interval to date with its RHEO-LOGIC constant rheology synthetic-based fluid system. RHEO-LOGIC is designed to minimize downhole mud losses through reduced surge pressures and ECD management in deepwater wells. The system is engineered to mitigate the detrimental effects that cold water temperatures and pressures have on the rheological properties of conventional SBM. The well is located in the Green Canyon area of the Gulf of Mexico. The 9-1/2" x 11" section was drilled to 29,467' MD (23,534' TVD) in 4,427' feet of water with a bottomhole circulating temperature of 218° F. Approximately 7,000 ft. of hole was drilled in this interval with minimal mud losses while building angle from 32° to 78°. The RHEO-LOGIC system enabled the operator to drill over 1,300 ft. below the deepest-known producing horizon, resulting in a significant increase in the net oil reserves.

RCI® serviceBaker Atlas Sets World Record by Recovering Fluid Samples from a 75° North Sea Well
Baker Atlas has set a world record for deploying the RCI® service on wireline by recovering fluid samples in a 75° North Sea well. Recommendations allowed the customer to avoid spending unnecessary rig time recovering samples on drill pipe. The RCI service was conveyed using the following deployment solutions: a crush resistant 490 multi-conductor wireline that worked reliably after being exposed to 13:1 wireline tension ratios in the well, Multi-conductor Releasable Cable Head (MRCH), hydraulic wireline jars and RCI flywheels. During one of the sampling runs, the tools became stuck twice in the borehole and both times the field crew activated the hydraulic jars to free the tools immediately. Due to the efficient acquisition of RCI data recovery in this well, the customer asked Baker Atlas to configure the XMAC® and EARTH Imager® services with flywheels and run them in the same well. The reconfigured instruments recovered high-quality data in a single wireline run with minimal rig time.

EQUALIZER® CompletionsBaker Oil Tools Providing EQUALIZER™ Completions in Vankor Green Field, Eastern Siberia
Baker Oil Tools is working on the Vankor Green Field development in Eastern Siberia. Baker Oil Tools is providing EQUALIZER completions for 29 wells in the customer’s 2008 first phase development program. The equipment consists of 29 km of EQUALIZER with EXCLUDER™ screen, 464 (oil/water) swellable packers and 29 sets of Hydraulic Set Liner Hangers systems. The vast Vankor Field is located in the northern part of the giant Krasnoyarsk Region in Eastern Siberia and is a strategic production growth source, with proven reserves of more than 945 million barrels of oil.

Electrical Submersible Pumping (ESP) SystemsCentrilift Takes Over 1000th Well for ESP Alliance in Indonesia’s Duri Field
Centrilift recently took over its 1000th well for a major ESP Alliance in Sumatra, Indonesia. Since April 2003, the Centrilift Duri Field Service Group has installed 2637 electrical submersible pumping (ESP) systems, which included running 2.9 million feet of cable. Currently, there is a cumulative 83,738 horsepower installed throughout the contract area of operations.


 Highlights...

SPE 2007 in AnaheimSuccessful SPE 2007 in Anaheim
Baker Hughes presented 28 SPE papers on topics ranging from drilling and formation evaluation to completions, production and permanent monitoring. Baker Petrolite launched its AuRATREAT™ encapsulated slow-release chemical treatment product line. Baker Hughes also presented its new interactive rig count interface at the show.

Baker Hughes Technology Days Seminar Held in LibyaBaker Hughes Technology Days Seminar Held in Libya
Baker Hughes held its Technology Days seminar in Tripoli, Libya during Nov. 20-21. On the first day, Baker Hughes technical experts made presentations on drilling, evaluation, completion and production technologies. The second day was devoted to client discussions and an overview of oilfield technologies for petroleum engineering students. More than 250 oil company representatives attended the seminar.

Technical ConferencesBaker Hughes at Technical Conferences

Middle East PetroTech 2008
January 14 - 16
Manama, Bahrain

SPE/IADC Managed Pressure Drilling & Underbalanced Operations Conference & Exhibition
January 28 - 29
Abu Dhabi, UAE

Offshore West Africa Conference & Exhibition
January 29 - 31
Abuja, Nigeria

View Tradeshow Calendar


To unsubscribe from this mailing list, please send us an e-mail to the following address: unsubscribe@bakerhughes.com

©2007 Baker Hughes Incorporated. All Rights Reserved. | Privacy Policy & Terms of Use

Baker Hughes Incorporated
2929 Allen Parkway, Suite 2100
Houston, TX 77019