Product Announcements
Baker Hughes Expands Line of Advanced Metal Milling Structures
05/03/2012HOUSTON, TEXAS (May 3, 2012) – Baker Hughes recently introduced METAL MUNCHER™ AMT (advanced milling technology) cutters to achieve greater efficiency and longer runs ...
Baker Hughes Introduces Rigless Intervention System
05/02/2012HOUSTON, TEXAS (May 2, 2012) – Baker Hughes’ new mechanized, self-pinning rigless intervention system, Mastiff™, provides operators an alternative method for ...
Baker Hughes Launches New Electronically Actuated Casing Packer, Wireless Top ...
05/01/2012HOUSTON, TEXAS (May 1, 2012) – As operators look to reduce risk in harsh offshore environments, Baker Hughes’ newest technologies offer the latest solutions in long ...
Baker Hughes Releases JewelSuite 2012 Reservoir Modeling Software
04/30/2012HOUSTON, TEXAS (Apr. 30, 2012) – Baker Hughes announces the release of JewelSuite™ 2012, the latest version of the global oilfield service company’s reservoir ...
Baker Hughes Introduces New Service to Detect, Diagnose Drilling Challenges ...
02/28/2012HOUSTON, TEXAS (Feb. 28, 2012) – A new Baker Hughes service identifies potential drilling issues before they occur by pinpointing similar case histories in real-time using a ...
Baker Hughes Expands Pipeline Inspection Services
02/07/2012HOUSTON, TEXAS (Feb. 7, 2012) – Baker Hughes has broadened its pipeline service portfolio to include circumferential magnetic flux leakage (MFL) inspection technology, which ...
New Baker Hughes Water Treatment Improves Efficiency, Reduces Costs
11/10/2011HOUSTON, TEXAS – Nov. 10, 2011 – A new Baker Hughes water treatment technology cost-effectively removes suspended solids and heavy metals without chemicals and treats ...
New Baker Hughes Multistage Stimulation Technologies Enhance Unconventional ...
11/09/2011HOUSTON, TEXAS – Nov. 9, 2011 – Baker Hughes offers three multistage stimulation technologies that provide operators with time- and cost-efficient completion solutions ...
Baker Hughes Offers Mobile Drilling Waste Recycling Facility
11/08/2011HOUSTON, TEXAS – Nov. 8, 2011 – Baker Hughes’ Eco-Centre CR, a mobile and portable onshore waste facility, offers operators a one-stop solution to processing a ...
HOUSTON, TEXAS – Oct. 31, 2011 - WellLink 3D
11/04/2011HOUSTON, TEXAS – Nov. 4, 2011 – Turning wellbore-related data into real-time imagery for enhanced well planning and optimization, directional drilling and reservoir ...
Baker Hughes Introduces New Version of WellLink™ 3D Visualization
11/04/2011HOUSTON, TEXAS – Nov. 4, 2011 – Turning wellbore-related data into real-time imagery for enhanced well planning and optimization, directional drilling and reservoir ...
New Baker Hughes Multistage Stimulation Technologies Enhance Unconventional ...
10/31/2011HOUSTON, TEXAS – Oct. 31, 2011 – Baker Hughes offers three multistage stimulation technologies that provide operators with time- and cost-efficient completion solutions ...
Baker Hughes Offers Highly Accurate PDC Drill Bits
10/31/2011HOUSTON, TEXAS – Nov. 7, 2011 – The Talon™ 3D high-efficiency vector-accurate PDC bit shortens the time it takes to drill a well and offers Baker ...
New Baker Hughes’ Water Treatment Improves Efficiency, Reduces Costs
10/31/2011HOUSTON, TEXAS – Oct. 31, 2011 – A new Baker Hughes water treatment technology cost-effectively removes suspended solids and heavy metals without chemicals and treats ...
New Baker Hughes Research and Technology Center in Brazil Demonstrates Next ...
10/07/2011HOUSTON, TEXAS – Oct. 7, 2011 – Baker Hughes (NYSE: BHI) announced today the opening of a new research and technology center in Rio de Janeiro designed to enable the ...































































