Completion System Designed to Monitor Frac Operation

Baker Hughes delivered real-time fracturing and production monitoring

A well located in the Bakken shale had a vertical cased section of 10,000 ft (3048 m) and a 10,000 ft openhole horizontal section. The completion consisted of 10 stages; five of the stages were monitored using PT gauges. The operator wanted to monitor separate frac events in multiple zones and to continue monitoring the zones during production.

The client selected Baker Hughes as the total solution provider for the well, because we could provide an integrated package of products and services across multiple product lines. These products included the FracPoint™ multistage fracturing system, SureSENS™ PT gauges, and SureView™ DTS monitoring system. The FracPoint system is deployed in one trip and reliably establishes isolation between zones. It allows frac fluid to be delivered where it is needed for maximum effect. The result is accurate fracture placements that improve initial productivity and accelerate reservoir drainage.

In this completion, the Baker Hughes FracPoint system used packers to isolate stages of the wellbore and frac sleeves to direct the frac treatment to the desired stage. This type of completion significantly reduces the overall pumping time, and eliminates coiled-tubing operations, wireline operations, and the need to cement the liner. The FracPoint system was combined with the Baker Hughes SureSENS 175 PT gauges and SureView DTS fiber-optic technology to capture real-time data during the installation, fracturing, and production stages of the well.