Success Stories
16-stage hydraulic fracturing job completed in 18 hr
02/03/2012In Canada’s Montney shale, one of our pressure pumping teams completed a 16-stage frac job at a depth of about 9,843 ft [3,000 m] with a 5,249-ft [1,600-m] horizontal ...
Coiled-tubing drilling revitalizes wells
10/30/2011Offshore Malaysia, wells in a mature field are producing again for the first time in nearly two decades. Following thorough analysis and planning, we deployed the ...
Near-bit gamma-ray service confirms reservoir top
10/05/2011Working offshore, an operator concerned about setting casing near an overpressured zone called on us to determine the best approach. We decided to use the Baker Hughes ZoneTrak ...
Accident-free work in extreme conditions sets safety record
08/24/2011In northern Siberia, an operator and the state regional oil company recognized our teams for marking 500 days without a recordable safety incident. We were recognized for our ...
Better perforating increases production 38%
08/24/2011An operator working in the North Sea asked us to determine if production could be increased in a well that requires reperforating on a regular basis. Production continually ...
Premium PDC bit sets record
08/24/2011In the Permian Basin of Texas, our premium PDC bit set a county drilling record. A 7 7/8-in. Hughes Christensen Quantec Force™ PDC bit drilled 9,425 ft [2,873 m] in one fast ...
Deepwater Brazil well drilled 13 days faster
08/11/2011At a rig rate of more than $1 million per day, an operator working offshore Brazil saved 13 days and recorded two fewer runs compared with an offset well. In the deepwater ...
Coring team increases sample recovery by 44%
07/26/2011In the Middle East, we were challenged with retrieving 500 ft of core in demanding formations in two high-profile gas exploration wells.The Baker Hughes coring team acquired 720 ...
ROP increases 109% with fewer trips
07/26/2011An operator working off the east coast of Canada asked us to increase ROP and reduce bit trips in a demanding section. We recommended the Hughes Christensen Quantec ...
Operator saves nearly $500,000 in two sections
07/26/2011Using customized BHAs in a total systems approach for two offshore sections in the Middle East, an operator set a record for the fastest drilling time and saved nearly a half ...
Reservoir characterization job wrapped up flawlessly
07/26/2011An operator needing petrophysical information to predict reservoir behavior during production asked for our help in India. Our local wireline teams recommended the Baker Hughes ...
Precise reservoir navigation keeps wellbore within tight productive zone
07/13/2011Baker Hughes Reservoir Navigation Services (RNS) and our AutoTrak rotary steerable systems scored another success by maintaining a wellbore within a 9-ft thick productive zone for ...
Fluid systems save a week of drilling time in record-setting well
07/12/2011Two oil-based drilling fluid systems saved seven drilling days compared with the offsets for an operator working in Louisiana. The Baker Hughes NEW-DRILL™ system in the ...
Operator explores bypassed pay zone using remote logging
07/11/2011A major operator working offshore New Zealand chose our Surface Logging Services (SLS) to log a bypassed pay zone remotely. This real-time, safer approach also enhanced decision ...
Operator reduces NPT with efficient wellbore cleanout
06/06/2011An operator working in deepwater Gulf of Mexico needed to drill a sidetrack in a 9 5/8-in casing after the hole packed off because of an unstable wellbore. A cement retainer was ...














































































