Transmatic Interventionless Plug

Reduce well intervention cost by eliminating wireline

The Centrilift Transmatic™ plug reduces intervention cost in gas lift applications requiring wireline to remove dummy valves. The Transmatic plug is installed in a live gas lift valve, replacing the dummy valve in the initial completion.   

The plug will disintegrate in completion fluid in 12 to 24 hr. This allows the dummy valve to function as a live valve after that time frame.

The plug is made of a controlled electrolytic metallic (CEM™) material recently developed in our laboratories. The plug will not react with drilling mud or produced oil, but will disintegrate in salt water.

For more information about our Transmatic interventionless plug, please call us or send us an e-mail.

Deepwater

When you’re spending $350 per minute on a $500,000-per-day deepwater rig, you can be confident our global expertise enables you to work safer with minimized NPT.

View More

Additional Resources

Case Histories

Brochures / Overviews