MICRO-PRIME minimizes displacement, clean-up costs of highly deviated well

Baker Hughes succeeds with fluids deployment in GOM

Baker Hughes Solution and Results

A major operator required a high-efficiency wellbore cleanup spacer system to displace a 10.5 lb/gal Baker Hughes’ RHEO-LOGIC™ synthetic-based mud (SBM) with a 10.3 lb/gal NaBr brine in a highly deviated well in 4,850 ft of water.

The operator selected the Baker Hughes’ MICRO-PRIME™ wellbore cleaning spacer system, engineered to optimize the wellbore cleanup process when displacing synthetic and oil-based drilling fluids.

Download the PDF to read more.
 

PDF

Completions Fluids

We offer a complete line of solids-free fluids designed to help you effectively complete your well and initiate an economically viable production flow.

View More