Talk to an Expert

Highlights


Benefits

  • Minimize heavy equipment and personnel at the wellsite
  • Reduce well cleanup times and costs by 50% compared to conventional operations
  • Eliminate high-pressure gas and chemicals to minimize environmental impacts
Applications

  • Vertical, deviated, horizontal, and multilateral wells, onshore and offshore
  • High-risk cleanup operations requiring an alternative to CT nitrogen-lifted cleanup methods
  • Cleanup operations in larger tubing requiring faster pump rates
Overview

Effective well cleanup is an essential post-completion step to getting your reservoir ready for long-term production. But in long, complex wells, flowback and cleanout are risky and time-consuming via conventional coiled-tubing (CT) nitrogen lift operations.

The JumpStart™ well cleanout service from Baker Hughes delivers a highly reliable, cost-effective alternative to conventional well cleanups requiring heavy interventions. JumpStart temporarily installs a slickline-retrievable AccessESP™ retrievable electric submersible pump in the well to remove heavyweight kill fluids—in half the time required for a CT-deployed nitrogen lift operation. As a result, you can bring your well into production far earlier and with lower transportation costs, fewer heavy lifts, and a smaller rig crew.

During times of high CT rig rates and uncertain availability, the JumpStart service provides a faster, more reliable, and cost-effective cleanout solution for your high-value wells.  

Contact us to learn how the JumpStart well cleanout service can get your wells into production with less uncertainty, risk, and delay.




Get in touch with an expert.

Your request has been submitted.
Thank you for your interest. A specialist will be in touch with you shortly.