Highlights

Highlights


Benefits
  • Removes fluids: Increases gas production, Increases oil production
  • Extends ESP run life
  • Lowers bottomhole pressure
Applications
  • Unconventional horizontal wells

Overview

Overview

As reservoir pressure depletes during production, natural gas released from the reservoir accumulates in the undulations along a horizontal lateral. When these gas slugs break free, they create low-flow / no-flow conditions in your electrical submersible pumping (ESP) system. These conditions can:

  • Interrupt production
  • Limit reserve recovery
  • Impact system reliability
Eliminate production interruptions

The CENesis™ PHASE multiphase encapsulated production solution encases your entire ESP system in a shroud to naturally separate gas slugs from the production stream before they can enter your pumping system. The design:

  • Stabilizes production
  • Improves pumping system efficiency
  • Eliminates nonproductive time (NPT) caused by system cycling and gas locking

This continuous production profile also more effectively draws down reservoir pressure to release additional hydrocarbons from the reservoir, improving reserve recovery and return on investment.

Reduce operating expenses

Keeping gas slugs out of your ESP eliminates wear and tear on the system due to cycling, gas locking, or pump overheating. The encapsulated system design also protects the motor lead extension during installation in deviated or horizontal wellbores. An integrated recirculation system further enhances reliability by continuously diverting fluid past the ESP motor to prevent motor overheating.

Contact your Baker Hughes representative for more information on how the CENesis PHASE solution can help you improve production and eliminate NPT.

Resources

Case Study
CENesis PHASE system increased run life 440% in unconventional well
pdf
pdf: 282.64 KB
.pdf 282.64 KB
Case Study
CENesis PHASE multiphase encapsulated production solution increased gas/fluids production 126% and 123% respectively
pdf
pdf: 102.68 KB
.pdf 102.68 KB
Case Study
Slimline CENesis PHASE system eliminated gas lock conditions, increased oil production 61%
pdf
pdf: 149.97 KB
.pdf 149.97 KB
Case Study
Slimline CENesis PHASE solution increased ESP system uptime to 97% in extremely gassy well
pdf
pdf: 150 KB
.pdf 150 KB
Case Study
CENesis PHASE production system increased oil production by 48%, drawdown by 40%
pdf
pdf: 104.21 KB
.pdf 104.21 KB
Case Study
CENesis PHASE solution increased ESP run time, eliminated gas-related shutdowns
pdf
pdf: 468.52 KB
.pdf 468.52 KB


Additional resources

Visit our full website for more product details

Energy Forward

Read our latest insight and inspiration stories

Get in touch with an expert.

Your request has been submitted.
Thank you for your interest. A specialist will be in touch with you shortly.