Save time and money on your electrical submersible pumping (ESP) installations with alternative deployment methods from Baker Hughes. Our unique, rigless deployment technologies help you increase production and boost recovery from your wells, without the increased expense and downtime of waiting for an intervention vessel.
Reliable coiled tubing deployment—with no wait or worries
Proven alternative solutions include coiled tubing deployment, which replaces traditional tubing lengths with continuous coiled tubing. This deployment option allows for faster ESP installs and pulls, without killing the well or compromising your HSE metrics. And because these systems can be installed with a coiled tubing rig, you’re assured dramatically lower workover costs.
Our alternative deployment systems have successfully installed lift technologies like the TransCoil™ rigless-deployed ESP system in critical well applications. The TransCoil system delivers all the increased production and reserve recovery of a conventional ESP—and at dramatically lower cost and risk.
Contact us to learn how alternative deployment systems can improve the efficiency and economics of your ESP installations.