OUR APPROACH

With 99.8% reliability and 99% average availability our technology and teams have what it takes to support LNG projects



LNG Image 1

We’ve been committed to LNG for over 30 years

There are currently 45 LNG plants in operation or under construction around the world that rely on our turbomachinery—which drives over 350 MTPA of global installed LNG capacity. We're the most referenced OEM for large gas turbines on main refrigerants.

LNG Image 2

A history of industry firsts

In 1989 at Woodside: first to use a gas turbine train for LNG. In 2008 at Qatargas: five simultaneous major overhauls that cut outage time in half. In 2017 for Petronas: core machinery for the first floating liquefied natural gas (FLNG) facility. In 2019 for Freeport: first to use large motors for e-LNG.

LNG Image 3

Our solutions have continually increased economies of scale

Our 7.8 MTPA trains for Qatargas 2 were the world's largest in 2009. In 2018, we took FLNG to new heights after just two years, with 3.6 MTPA capacity on Prelude.  And, we installed three electric LNG trains with a combined capacity of 13 MTPA at Freeport in 2019.







Our expertise

Supporting 450+ million tons of capacity







Featured Video

LM9000 Gas Turbine
LM9000 Aeroderivative Gas Turbine—ideal for LNG mechanical drive